implemented projects
de-icing fluid storage and loading terminal
project
summary
Working for FINAVIA in tandem with Putki ja Levyrakenne Oy, we built a terminal at the Helsinki International Airport for the storage and loading of aircraft de-icing fluid.
This project included piping works for the reservoir park, the installation of technological equipment, and connecting a heating system. Material: AISI 304/316. Primary piping diameters: DN25-DN200. Welding methods: MMA, TIG.
This project included piping works for the reservoir park, the installation of technological equipment, and connecting a heating system. Material: AISI 304/316. Primary piping diameters: DN25-DN200. Welding methods: MMA, TIG.
project
parameters
- Period of implementation
2017 – 2018 - Location
Helsinki, Finland - Type
industrial construction - Scope
installation of technological pipelines and equipment