implemented projects
jet fuel depot for an air base
project
summary
Commissioned by the NATO Support and Procurement Agency (NSPA) in cooperation with the Czech company VAE CONTROLS, we carried out the construction of a storage facility for JET A-1 gas turbine fuel at the Latvian National Armed Forces airfield in Lielvārde.
The technological stage of the project included piping works for the reservoir park and the installation of technological equipment to feed jet fuel from road tankers. Our specialists carried out TIG and ММА welding work. Primary piping diameters: DN25-DN250. Material: AISI 304/316.
The technological stage of the project included piping works for the reservoir park and the installation of technological equipment to feed jet fuel from road tankers. Our specialists carried out TIG and ММА welding work. Primary piping diameters: DN25-DN250. Material: AISI 304/316.
project
parameters
- Period of implementation
2014 – 2015 - Location
Lielvarde Air Base, Latvia - Type
oil and gas construction - Scope
installation of technological pipelines and equipment